Highlights
Country: Croatia
Project: Government School Network Upgrade (Approx. 400 km²)
Duration: 6 months from design to shipment
Achievements: Project completed 45 days ahead of schedule
Cooperation: From small retailer to established telecom service provider
Overview
At the end of 2015, a local telecom equipment retailer from Croatia reached out to us through our website’s inquiry form. The client had learned of an upcoming government bidding project aimed at upgrading network systems for all public schools within a regional district of approximately 400 square kilometers.
Although technically capable, the client lacked large-scale project experience and sufficient financial resources. Having previously distributed some of our products, he decided to contact us—hoping we could help him compete in this new opportunity. What followed was the beginning of a long-term partnership built on trust, technical collaboration, and shared growth.
Challenges
The client faced several significant barriers:
Limited experience with large-scale fiber network projects.
Tight project budget imposed by government procurement policies.
Restricted cash flow, which made upfront payment difficult.
Despite these limitations, the client was determined to participate in the tender. Our challenge was to provide both technical and financial solutions that could help him win and deliver the project successfully.
Solutions
After carefully assessing the client’s situation, our engineering and sales teams worked closely with him over six months to develop a complete and competitive solution package:
Tender Support: We assisted in preparing the technical proposal, including system design, test data reports, and product documentation.
Sample Verification: We supplied physical samples for on-site testing and environmental verification to ensure compliance with the tender’s technical requirements.
Cost Optimization: Based on local climate and outdoor conditions, we designed a high-performance yet cost-effective fiber optic solution that balanced durability and budget constraints.
Flexible Payment Terms: To help relieve financial pressure, we offered a low down payment with installment-based final payments, enabling the client to proceed confidently.
Results
With our full technical and logistical support, the client won the fiber optic mainline subproject of the government’s school network upgrade. Our factory prioritized production and completed shipment ahead of schedule, allowing the project to finish 45 days earlier than planned.
Following this success, the client went on to secure several additional regional upgrade contracts over the next two years—transforming from a small telecom retailer into a recognized telecom service provider across Eastern Europe.
Today, our partnership remains strong, built on mutual trust and continuous collaboration. This case stands as a testament to how technical expertise, flexibility, and genuine cooperation can empower small businesses to achieve extraordinary growth.